domingo, 22 de junio de 2008

Mural Installation

For detail view click HERE


Mural Section:

Section plan E-E illustrating west wall elevation and its relationship to first level main hall, second level laboratories and third level faculty staff offices.

Corte del Mural:

Corte E-E ilustrando elevación poniente del mural y su relación pasillo en el primer nivel, laboratorios en el segundo nivel y oficinas docentes en el tercer nivel.



For detail view click HERE



Mural Anchoring System:

Mural modular system anchored with steel enamelled stretcher bars. The objective was to achieve a “floating effect” with a 5 mm shadow line between each panel. The overall shadow box type installation is to convey a pictorial space rather than an oversize picture frame, similar to the concept of Chinese lacquer screen painting or Japanese rice paper Shoji screens.

Sistema de Anclaje del Mural:

Sistema de anclaje modular del mural con bastidores de acero esmaltados. El objetivo fue crear un efecto de flotado con una línea de sombra de 5mm entre cada panel. Este tipo de instalación como cajas de sombra se vincula con la idea de un espacio pictórico, contrario a un cuadro pictórico sobre dimensionado. Este concepto es similar a los biombos chinos y las panderetas de papel de arroz japonesas.



For detail view click HERE


Mural Installation General Views:

Main floor, second and third level views of mural installation and veil dismantle during inauguration ceremony at the Metallurgical Engineering Building, University of Concepción, August 26, 2005.

Vistas Generales del Mural:

Vistas piso principal, segundo y tercer nivel del mural en el momento de su desvelamiento durante la ceremonia inaugural el 26 de agosto de 2005 en el edifico de Ingeniería Metalúrgica de la Universidad de Concepción.

No hay comentarios: